6 Person Pumped Marsh ENsign Sewage Treatment Plant Installation


Last week our Marsh Industries approved installers were carrying out an installation for a customer near Boston, Lincolnshire. There existing septic tank was in need of repair as well as their old soak-away which was causing the customer to have to have their tank emptied very frequently. They got in touch with Bates Environmental after being impressed with our operative's emptying their tank and after a FOC site visit and no obligation written quote they decided very quickly to upgrade their system to the Marsh Ensign 6 person pumped treatment plant.


Our engineers arrived on site and after the first day the tank was in the ground and connections were starting to be made. On day two of the installation our operatives focussed on the outflow and putting in the electricity supply to power the very low energy usage compressor and pump. The third day was tidy up and leave site with the customer happy.


As you can see from the photos the area has been left tidy and we even provided some additional gravel for the customer to ensure that they were happy with how their property was left.


If you are thinking of upgrading your sewage system then please don't hesitate to contact us.